-
Products
-
Quality Assurance
-
-
Precautions for replacing vulnerable parts of oil drill pipes in special scenarios
release time:2025-06-05
source: network
Firstly, when working in a high-temperature environment:
1. Cooling measures: Use water mist to cool the high-temperature drill rod to below 60 ℃ before operation to prevent burns or material annealing.
2. Anti slip treatment: Operators wear insulated gloves and wrap the tool handle with anti slip tape.
Secondly, when working in a confined space:
1. Ventilation requirements: Forced ventilation is required until the oxygen content is ≥ 19.5% and the concentration of toxic gases is below the occupational exposure limit.
2. Lighting scheme: Use explosion-proof LED lights to avoid generating electrical sparks.
Handling in case of emergency:
1. Leakage response: Equip with emergency supplies such as absorbent cotton and leak sealing fixtures, and immediately activate emergency procedures in case of leakage.
2. Personnel evacuation: Set up escape routes and conduct regular emergency drills.
Previous Page:
Previous:
Previous:
Previous Page:
Related News
Recommended
Contact Us
Contact information
Address: 3rd Floor, Block B, Oriental International Mansion Commercial Building, Qinyuan Street, Jiyuan City, Henan Province
SAF Coolest v1.3 设置面板 OUJSX-ZPVW-WFASE-ZWF
无数据提示
Sorry, the current column has no content for the time being.!
You can view other columns or returnHome Page