Operation specifications for oil drill pipes under high temperature weather


release time:2025-09-17

source: network

        Firstly, regarding the control of rotation speed and depth: when verticality is not guaranteed or geological conditions are unknown, it is strictly prohibited to use a mix ratio with high rotation speed and high penetration speed to avoid excessive stress on the drill pipe.
        Secondly, for the monitoring of the power head current: carefully monitor the power head current and the applied current, and do pre control work when it is 80% away from the maximum allowable value to prevent equipment overload.
        For monitoring the drilling process: observe the operation of the drill pipe and joints at any time, stop the machine for inspection in a timely manner if any abnormal noise or vibration is found, and prevent the drill pipe from bending or flattening.

Return to List Back to list