Emergency Management of Oil Drill Pipe for Preventing and Dealing with High Temperature Related Accidents


release time:2025-09-03

source: network

1. Emergency management of fires and leaks: When a drill pipe is found to be leaking, drilling should be stopped immediately, and the broken rod should be extracted using a slip salvage tube or a reverse threaded female cone; If encountering a blockage, use a shock absorber to release the blockage and prevent high-pressure fluid flow from eroding the wellbore.
2. Management of flammable liquids: Storage tanks need to be equipped with sunshades, and the temperature inside the tank should be controlled below 35 ℃; Daily monitoring of tank pressure and manual discharge of safety valves once a week to prevent high temperatures from causing explosions.
3. Rescue plan for personnel suffering from heatstroke: When a person is found to have a flushed complexion or rapid breathing, immediately move to an air-conditioned area to replenish water and cool down; If symptoms of heat stroke occur (such as blurred vision), it is necessary to wipe the body with cold water and seek medical attention.
4. And regular training and drills: regularly organize training on cardiopulmonary resuscitation and heatstroke emergency rescue to ensure that employees master first aid skills; Emergency rescue tripods are equipped at the entrance, and monitoring personnel are on duty throughout the entire process.

Return to List Back to list