-
Products
-
Quality Assurance
-
-
Three of the Four Key Dimensions for Oil Drill Pipe Maintenance—Post-Operation Maintenance Elements
release time:2026-09-15
source: network
The maintenance of oil drilling rods after operation is also one of the key links to ensure drilling safety and extend equipment life.
🧹 Maintenance elements after homework
Surface dirt cleaning: After each shift, thoroughly clean the mud, oil stains, and rock debris on the surface of the drill pipe to avoid long-term adhesion and corrosion of the pipe body by corrosive media.
Damage marking filing: Specially mark and store drill pipes with slight wear and local deformation detected separately, limited to use in low load shallow well scenarios.
Previous Page:
Previous:
Previous:
Previous Page:
Contact Us
Contact information
Address: 3rd Floor, Block B, Oriental International Mansion Commercial Building, Qinyuan Street, Jiyuan City, Henan Province
SAF Coolest v1.3 设置面板 OUJSX-ZPVW-WFASE-ZWF
无数据提示
Sorry, the current column has no content for the time being.!
You can view other columns or returnHome Page
