-
Products
-
Quality Assurance
-
-
Three of the Four Key Dimensions for Oil Drill Pipe Maintenance—Post-Operation Maintenance Elements
release time:2026-09-15
source: network
The maintenance of oil drilling rods after operation is also one of the key links to ensure drilling safety and extend equipment life.
🧹 Maintenance elements after homework
Surface dirt cleaning: After each shift, thoroughly clean the mud, oil stains, and rock debris on the surface of the drill pipe to avoid long-term adhesion and corrosion of the pipe body by corrosive media.
Damage marking filing: Specially mark and store drill pipes with slight wear and local deformation detected separately, limited to use in low load shallow well scenarios.
Related News
Recommended
Contact Us
Contact information
Address: 3rd Floor, Block B, Oriental International Mansion Commercial Building, Qinyuan Street, Jiyuan City, Henan Province
SAF Coolest v1.3 设置面板 OUJSX-ZPVW-WFASE-ZWF
无数据提示
Sorry, the current column has no content for the time being.!
You can view other columns or returnHome Page
